Chrysanthemum Pier Works

It appears further to the last post that the plan is to first repair the piles at Chrysanthemum Pier and once this is carried out,  the original pontoon which was inside the piles and removed in 2007 will be reinstalled (with modifications) and the pier will be used by Crown River Cruises 

Leave a Reply

Your email address will not be published. Required fields are marked *